top of page
7BC9E1EF-6D12-494E-AD16-16380F8B8D2C.jpeg

Great Baddow Driveway

Our Project

Great baddow Driveway

This project was undertaken in Great Baddow, the same place as our largest garden project to date.

This was also our largest frontage project to date.
This job consisted of a 420 sqm Marshall Coppice driveway, in which we excavated over 125 tonnes of earth, installed 80 tonnes of sub-base, and 30 tonnes of sand in preparation for screeding this large driveway, along with over 42 packs of blocks. We produced the goods.

​

We installed 250 bullnose kerbs to form the beds for the red robin hedging.

We added a lovely sandstone ball water feature and laid a new lawn area.

We created a stone flowerbed with lighting towards the main front door.